Project Name | Client | Location |
---|---|---|
Stainless steel piping works including insulation and cladding works of solar water system | Al Manhal Water Factory | Riyadh |
Boiler maintenance and stainless steel pipe works on R.O.plant | PEPSICO (TROPICANA JUICE) | Riyadh |
School Buildings, 6 Units | M.O.E | Riyadh |
Construction of Villas for Electrical Substation Nine, 12 Villas |
SEC | Riyadh |
Stainless steel piping and various machine installation for line 9 | HWB (NOVA WATERS) | Riyadh |
Forensic Medicine Project | M.O.H | Riyadh |
Shopping, Recreational & Tourist Complex | Al- Hokair Group | Jizan |
Prison Building | Ministry of Culture & Information | Riyadh |
K 21-Jeddah | Ministry of Culture & Information | Jeddah |
Project Name | Client | Location |
Installation of steam network | UCIC (WATAN PAC) | Riyadh |
Installation of additional firefighting pipe line | UCIC (WATAN PAC) | Riyadh |
Construction of Housing for Personnel | Akaria Co. | Riyadh |
Construction of Warehouses | National Guard | Riyadh |
Erection of a Steel Structure Building | Ministry of Finance | Riyadh |
Bldg. Maintenance & Plumbing Works | Public Security | Riyadh |
Boiler installation and piping network, Testing commissioning @ Al Hanna Juice Factory | TETRA PAC | Qassim |
Qassim Mall Project | Al-Hokair Group | Qassim |
AL-Rawdah Palace | Prince Abdulaziz Bin Abdullah | Riyadh |
Project Name | Client | Location |
Khozam Palace | Prince Turki Bin Mohammed | Riyadh |
Construction of Central Workshop | Al-Hokair Group | Riyadh |
Boiler supply, installation and piping works, including testing commissioning @ AUJAN SOFT DRINKS | Aujan Industries | Dammam |
Replacement of Cooling Tower, Saad Plant | National Water Company | Riyadh |
Erection of Heat Recovery Unit’s Chimney, PP8 | SEC | Riyadh |
Crude Oil Supply Line, PP7 | SEC | Riyadh |
Chilled Water Pumps | King Khalid University (Abha) | Abha |
Hot Water Boilers and Pumps | King Khalid University (Abha) | Abha |
Steam boilers maintenance and de-scalling | Al rabie Juice Factory | Riyadh |
Steam boiler complete refurbishment | National Carton factory | Riyadh |
Erection of pipe bridge for ss316 pipe line | HWB (Nova Waters) | Saad |
Project Name | Client | Location |
Academic Building for Health & Sciences (Radiology Rooms) |
National Guard | Al Hasa |
Children’s Hospital (Bio-Medical Rooms) | National Guard | Riyadh |
400-Bed Hospital – Jeddah | M.O.H | Jeddah |
400-Bed Hospital – Riyadh | M.O.H | Riyadh |
Design and construction of Laboratory room | HWB (NOVA WATERS) | Saad |
Installation of boiler and steam piping networks including testing commissioning @ National Hospital Riyadh | Tarouk Contracting Co. | Riyadh |
Installation of hot water boiler including piping works, testing, commissioning | Saudi Ceramics | Riyadh |
100 Cubic meter product tank including piping works and steam piping network | Shell | Riyadh |
Comments are closed.